TORICH ASTMA106 GrB Q235 Q345 Seamless Carbon Tube For High Pressure Boilers

FOB Reference Price:Get Latest Price
$800.00 - $1,500.00 / Metric Ton | 5 Metric Ton/Metric Tons (Min. Order)
Shipping:
Support Sea freight
Lead Time:
Quantity(Metric Tons) 1 - 5 >5
Est. Time(days) 30 Negotiable
Samples:
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Zhejiang, China
Brand Name:
TORICH
Model Number:
ASTM A106
Application:
Gas Purification
Shape:
Carbon Fiber Tube, Round
Dimensions:
4-420mm*0.5-50mm
Product Type:
Carbon Electrode Paste
C Content (%):
0.06-0.18
Working Temperature:
1200℃
S Content (%):
≤0.035
N Content (%):
≤0.035
H Content (%):
≤0.25
Ash Content (%):
N/A
Volatile:
N/A
Product name:
ASTM A106 Seamless Carbon Steel Boiler Tubes For High Pressure Boilers
Keyword:
Boiler Tubes
Type:
Boiler Tubes
Surface:
Oiled
Material:
Q235 Q345
Length:
4-12m
OD:
4-420mm
WT:
0.5-50mm
Terms Of Trade:
CIF FOB CFR
Supply Ability
Supply Ability:
50000 Ton/Tons per Year Carbon Tube
Packaging & Delivery
Packaging Details
TORICH ASTM106 GrB Q235 Q345 Seamless Carbon Tube For High Pressure Boilers
Port
ShangHai NingBo
Lead Time :
Quantity(Metric Tons) 1 - 5 >5
Est. Time(days) 30 To be negotiated
Video Description

TORICH ASTM106 GrB Q235 Q345  Seamless Carbon Tube For High Pressure Boilers

 Material: Carbon Steel

 

Production: Tubes are manufactured by seamless process and both hot finished and cold finished are applicable.

 

Size range: O.D.: 12.7-177.8mm W.T.: 1-25.4mm L: according to customer requirement

 

Applications:

for Boilers,Superheaters,

Heat-Exchangers,

High-pressure Boilers,

Steam Boilers

Cold Condensers and High-Pressure Services,

High-Temperature Services for Boiler Constructions

 

Heat treatment:
Hot finished tubes need not be heat treated.

Cold Finished tubes are heat treated after the final cold finishing pass at a temperature of 1200℉(650℃) or higher

 

Steel Grade and Chemical Compositions:

C0.06-0.18
Mn0.27-0.63
P≤0.035
S≤0.035
Si≤0.25

 

Mechanical Properties
Tensil Streghth: min ksi[Mpa] 47[325]
Yield Point: min ksi[Mpa] 26[180]
Elongation: ≥35%

 

Hardness

Brinell HardnessRockwell Hardness Number
WT≥0.200in(5.1mm)WT<0.200in(5.1mm)
137HRB77HRB


Tests and Inspection:
Mechanical Testing:

Flattening Test

Flaring Test

Flange Test

Hardness Test

Hydrostatic Test

 

 

 

Characteristic:

High Creep Rupture Strength

High antioxidant properties

Good organizational stability

Good concentricity

Good OD and ID tolerance

High Precision

Stable quality

Smooth Roughness

TORICH QUALITY ASSURANCE

 

Processing:

RAW MATERIAL

INCOMING INSPECTION

STORAGE → CUTTINGHAMMERING → PICKING LUBRICATION → CLEANING → PHOSPHORI CLEAN

ENDS CUTTING←STRAIGHTENING←HEAT TREATMENT↔MIDDLLE CHECK↔ COLD DRAWING ← LUBRICATING

FINAL INSPECTION→BUNDING→STORAGE

 

Widely used in the field of:High pressure boiler

 

1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.

 

100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

 

       

 

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of Seamless steel tube ? is it free or extra ?

A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us 

TORICH ASTM106 GrB Q235 Q345  Seamless Carbon Tube For High Pressure Boilers